Portfolio

Real Charlotte Work, Real Results

A few of our completed projects — from playhouse assembly and bathroom fan replacement to wall repairs, painting and furniture builds. Every photo shows work by FixCraft VP.

Repair + repaint: real Charlotte work

These two pairs show the same areas before repair and after repair and painting: a crack above a doorway and a ceiling-to-wall seam.

Above the doorway

Before
Drywall crack above a door frame in Charlotte, NC, before repair
After
Same doorway after drywall crack repair in Charlotte, NC, with a smooth painted finish

The same doorway before crack repair and after repair and repainting.

Where the wall meets the ceiling

Before
Ceiling-to-wall seam crack in Charlotte, NC, before drywall repair
After
Same ceiling-to-wall seam after drywall repair and repainting in Charlotte, NC

Before and after views of the same ceiling-to-wall seam, repaired and repainted.

Explore drywall repair and painting services

Window blinds installation: before & after

Two views show a living room window before and after white faux-wood blinds were installed.

Living room window

Before
Living room window in Charlotte, NC, before blinds installation, bare window
After
White faux-wood window blinds installed in a living room in Charlotte, NC, after installation

The same window without blinds and with white faux-wood blinds installed.

A wider view of the window wall

Before
Wide view of a living room window wall in Charlotte, NC, before blinds installation, bare window
After
Living room window wall with white faux-wood blinds installed in Charlotte, NC, after installation

Another view of the same window wall before and after blinds installation.

Explore blinds installation services

Recent completed work

Furniture assembly & pantry shelves

Furniture assembly

Sectional sofa assembly

An L-shaped sectional assembled for a living room. Three views of the finished sofa, with its blue base lighting visible.

Furniture assembly service →
Cream L-shaped sectional sofa with blue lighting along the base in a living room
The assembled sectional in the living room.
Front view of the assembled cream sectional sofa with a corner seat and cup holders
Front view of the corner seating and center console.
Side view of the cream sectional sofa showing the armrest and blue base lighting
A closer view from the side.

Furniture assembly

Storage console assembly

A black console assembled with curved ends, sliding doors and a center drawer. The photos show the storage closed and open.

Furniture assembly service →
Assembled black storage console with rounded ends and ribbed sliding doors closed
The assembled console with its doors closed.
Black storage console with sliding doors open, interior shelves and a center drawer pulled out
The sliding doors and center drawer open to show the storage inside.

Shelves & storage

Pantry shelf installation

Three wood shelves fitted into an existing pantry alcove beside the surrounding storage.

Shelf installation service →
Three wood pantry shelves installed in a white alcove, viewed from below
The new shelves fitted inside the pantry alcove.
Wood shelves fitted into an existing pantry beside white storage shelves
A wider view of the shelves and the surrounding pantry storage.

Completed work · Before, during & after

Bathroom vanity installation

A new white vanity, from the open space to the installed cabinet, sink and faucet. Three stages of our work.

Bathroom vanity space before installation, with wall plumbing exposed above the tile floor
BeforeThe space before the new vanity went in.
White vanity cabinet positioned around the wall plumbing, with a level across the open top
In progressSetting the cabinet in place and checking it with a level.
Installed white bathroom vanity with a white countertop, rectangular sink and chrome faucet
AfterThe new vanity with its countertop, sink and faucet installed.

Completed work · Before & after

Bathroom vanity & vessel sink replacement

We replaced the old brown vanity and round sink with a black cabinet, a white countertop and an amber vessel sink. These photos show the same bathroom before and after the replacement.

Before
Old brown bathroom vanity with a round beige vessel sink before replacement
After
New black bathroom vanity with a white countertop and amber vessel sink installed by FixCraft VP

Completed work · Before & after

Kitchen floor section repair

A section of flooring had been cut out along the kitchen cabinets. We repaired that section. The before photos show the exposed strip; the after photos show the repaired floor along the cabinet base.

Before · overview
Kitchen floor before repair with an exposed strip along the white cabinets
After · overview
Repaired kitchen floor section along the white cabinet base
Before · detail
Close view of the cut-out floor section at the kitchen cabinet base
After · detail
Close view of the restored flooring along the kitchen cabinets
Before · another angle
Another angle of the exposed floor strip before repair

Outdoor assembly · Project spotlight

Backyard playhouse, from frame to finished

This wooden playhouse kit started with the wall and canopy frames. The finished build has a roof, a red door and a covered play kitchen. These photos show two stages of our assembly work.

See the playhouse build →
In progress
Wooden playhouse walls and canopy frame during assembly, before the roof and fabric covers were fitted
Finished
Completed wooden playhouse with a gray roof, red door and covered play kitchen

Bathroom ventilation · Project spotlight

Bathroom exhaust fan replacement

We replaced an older bathroom exhaust fan with a new ceiling unit with a built-in light. Here are the removed housing and the finished result.

See the fan replacement project →
Removed unit
Old bathroom exhaust fan housing in a cardboard box after removal
After replacement
New ceiling exhaust fan with its built-in light on in a tiled bathroom

Charlotte area · October 31, 2026

Closet drywall repair & repainting

Rows of anchor holes and larger drywall damage in a small walk-in closet. Follow the repairs, wall preparation and light yellow / cream repainting through the job photos.

See the closet repair project →
Before
Walk-in closet with rows of anchor holes and protected flooring before repair in the Charlotte area
After
Closet walls painted light yellow / cream with white baseboards and a cleared carpet in the Charlotte area

South End · Wall repair & painting

Interior painting, before & after

Mounting holes, damaged corners and uneven walls — repaired and repainted. See four photo comparisons from this South End project.

View the painting project →
Before
Stair wall with mounting holes before repair in South End
After
Same stair wall after repair and repainting in South End
Furniture AssemblyOffice & ConferenceGarage & StorageKids RoomIKEAPlumbing Fixtures
Mid-century walnut dresser set with brass handles, assembled by FixCraft VP in CharlotteFurniture Assembly

Mid-Century Walnut Bedroom Set

Three-piece walnut dresser and matching nightstands with brass pull handles. Reeded fronts aligned to the millimeter — assembled in a Ballantyne home.

Ballantyne, Charlotte
Round walnut reeded side table assembled in Charlotte SouthParkFurniture Assembly

Round Walnut Reeded Side Table

Solid walnut barrel-base accent table. Tight tolerances, every reed flush. Delivered ready-to-use, no wobble.

SouthPark
Pink vanity with LED tri-fold mirror assembled for a kid bedroom in CharlotteKids Room

Pink Vanity with LED Tri-Mirror

Full kid bedroom transformation. Three-panel mirror with built-in LED and aligned drawer pulls. A favorite project.

Matthews
Heavy-duty black steel storage cabinet assembled by FixCraft VPGarage & Storage

Heavy-Duty Steel Storage Cabinet

Locking steel cabinet, fully assembled and leveled. Drawers glide. Lock turns. Two hours from box to ready-to-load.

Pineville
Ironton 4-tier industrial shelving rack assembled in a Charlotte garageGarage & Storage

Ironton 4-Tier Industrial Shelving

Four-tier shelving rack assembled in a Charlotte garage.

Plantation Park
Walnut dresser assembled in Myers Park bedroom by FixCraft VPFurniture Assembly

Walnut Dresser — Bedroom Setup

Solid construction, reinforced drawer rails. Built once, built right. The kind of furniture that outlasts the Amazon delivery van.

Myers Park
Twelve office chairs assembled by FixCraft VP in a SouthPark Charlotte officeOffice & Conference

Office Chair Assembly — Set of 12

Twelve reclining office chairs built from flat-pack boxes. Bases, gas lifts, armrests and wheels — all set and ready to roll.

SouthPark
Complete pink kid bedroom assembled by FixCraft VP in Matthews NCKids Room

Pink Bedroom — Full Setup

Vanity, dresser, drawer chest — every piece assembled, leveled and pushed flush to the wall. Kid-room turnaround in one afternoon.

Matthews
Pink vanity assembly in progress with Ryobi toolsKids Room

Pink Vanity — Mid-Assembly

Ryobi tools, every screw hand-checked. The careful middle — where good builds become great ones.

Matthews
Light oak reeded desk assembled by FixCraft VP in Dilworth CharlotteFurniture Assembly

Light Oak Reeded Desk

Light oak desk with ribbed drawer fronts and matching pedestals on both sides. Solid build, clean lines, ready for work.

Dilworth
Walnut side table parts laid out before assemblyFurniture Assembly

Walnut Side Table — Build in Progress

All parts laid out before a single screw turns. Measure twice, drive once — the FixCraft way.

SouthPark
Open view of heavy-duty steel storage cabinet with shelvesGarage & Storage

Steel Cabinet — Inside Detail

Adjustable shelves, smooth-glide drawers, double-wall steel doors. Built to outlast the garage it sits in.

Pineville
IKEA wardrobe being assembled in Plaza Midwood CharlotteIKEA

IKEA Wardrobe Assembly

PAX-style wardrobe with sliding drawers and rails. Flat-pack to functional in under three hours.

Plaza Midwood
Heavy-duty pneumatic-tire utility cart assembled by FixCraft VPGarage & Storage

Heavy-Duty Utility Cart

Pneumatic-tire shop cart for a Charlotte warehouse. Bolted, balanced, and ready for daily abuse.

Charlotte
PSW steel storage cabinet delivered for assembly in CharlotteGarage & Storage

Steel Cabinet — Curbside Delivery

PSW Steel Cabinet, curbside drop-off. Ten minutes to inspect, then carried in and built on site.

Charlotte
FixCraft VP Handyman branded cap on a job site in CharlotteFurniture Assembly

On the Job — FixCraft VP

The cap that shows up on every job. Branded, insured, and on time across Charlotte.

Charlotte
New garbage disposal installed under a kitchen sink by FixCraft VP in Charlotte NCPlumbing Fixtures

Garbage Disposal Replacement — New Unit Installed

New under-sink garbage disposal installed, drain connection checked, dishwasher line connected, and the cabinet tested for leaks before cleanup.

Charlotte
Old garbage disposal removed during a replacement service in Charlotte NCPlumbing Fixtures

Old Disposal Removed During Swap

Old worn disposal removed during a Charlotte kitchen fixture swap. The new unit went in after checking the mounting ring, drain alignment, and under-sink fit.

Charlotte

What every job includes

Want your project on this page next?

Handyman appointments across Charlotte when the schedule allows.