Furniture assembly
Sectional sofa assembly
An L-shaped sectional assembled for a living room. Three views of the finished sofa, with its blue base lighting visible.
Furniture assembly service →


A few of our completed projects — from playhouse assembly and bathroom fan replacement to wall repairs, painting and furniture builds. Every photo shows work by FixCraft VP.
These two pairs show the same areas before repair and after repair and painting: a crack above a doorway and a ceiling-to-wall seam.
Two views show a living room window before and after white faux-wood blinds were installed.
The same window without blinds and with white faux-wood blinds installed.
Recent completed work
Furniture assembly
An L-shaped sectional assembled for a living room. Three views of the finished sofa, with its blue base lighting visible.
Furniture assembly service →


Furniture assembly
A black console assembled with curved ends, sliding doors and a center drawer. The photos show the storage closed and open.
Furniture assembly service →

Shelves & storage
Three wood shelves fitted into an existing pantry alcove beside the surrounding storage.
Shelf installation service →

Completed work · Before, during & after
A new white vanity, from the open space to the installed cabinet, sink and faucet. Three stages of our work.



Completed work · Before & after
We replaced the old brown vanity and round sink with a black cabinet, a white countertop and an amber vessel sink. These photos show the same bathroom before and after the replacement.


Completed work · Before & after
A section of flooring had been cut out along the kitchen cabinets. We repaired that section. The before photos show the exposed strip; the after photos show the repaired floor along the cabinet base.





Outdoor assembly · Project spotlight
This wooden playhouse kit started with the wall and canopy frames. The finished build has a roof, a red door and a covered play kitchen. These photos show two stages of our assembly work.
See the playhouse build →Bathroom ventilation · Project spotlight
We replaced an older bathroom exhaust fan with a new ceiling unit with a built-in light. Here are the removed housing and the finished result.
See the fan replacement project →Charlotte area · October 31, 2026
Rows of anchor holes and larger drywall damage in a small walk-in closet. Follow the repairs, wall preparation and light yellow / cream repainting through the job photos.
See the closet repair project →South End · Wall repair & painting
Mounting holes, damaged corners and uneven walls — repaired and repainted. See four photo comparisons from this South End project.
View the painting project →

Furniture AssemblyThree-piece walnut dresser and matching nightstands with brass pull handles. Reeded fronts aligned to the millimeter — assembled in a Ballantyne home.
Furniture AssemblySolid walnut barrel-base accent table. Tight tolerances, every reed flush. Delivered ready-to-use, no wobble.
Kids RoomFull kid bedroom transformation. Three-panel mirror with built-in LED and aligned drawer pulls. A favorite project.
Garage & StorageLocking steel cabinet, fully assembled and leveled. Drawers glide. Lock turns. Two hours from box to ready-to-load.
Garage & StorageFour-tier shelving rack assembled in a Charlotte garage.
Furniture AssemblySolid construction, reinforced drawer rails. Built once, built right. The kind of furniture that outlasts the Amazon delivery van.
Office & ConferenceTwelve reclining office chairs built from flat-pack boxes. Bases, gas lifts, armrests and wheels — all set and ready to roll.
Kids RoomVanity, dresser, drawer chest — every piece assembled, leveled and pushed flush to the wall. Kid-room turnaround in one afternoon.
Kids RoomRyobi tools, every screw hand-checked. The careful middle — where good builds become great ones.
Furniture AssemblyLight oak desk with ribbed drawer fronts and matching pedestals on both sides. Solid build, clean lines, ready for work.
Furniture AssemblyAll parts laid out before a single screw turns. Measure twice, drive once — the FixCraft way.
Garage & StorageAdjustable shelves, smooth-glide drawers, double-wall steel doors. Built to outlast the garage it sits in.
IKEAPAX-style wardrobe with sliding drawers and rails. Flat-pack to functional in under three hours.
Garage & StoragePneumatic-tire shop cart for a Charlotte warehouse. Bolted, balanced, and ready for daily abuse.
Garage & StoragePSW Steel Cabinet, curbside drop-off. Ten minutes to inspect, then carried in and built on site.
Furniture AssemblyThe cap that shows up on every job. Branded, insured, and on time across Charlotte.
Plumbing FixturesNew under-sink garbage disposal installed, drain connection checked, dishwasher line connected, and the cabinet tested for leaks before cleanup.
Plumbing FixturesOld worn disposal removed during a Charlotte kitchen fixture swap. The new unit went in after checking the mounting ring, drain alignment, and under-sink fit.
Handyman appointments across Charlotte when the schedule allows.